Skip to content

中文

Steven Holl Architects
  • Studio + Contact
  • Ecological Resilience
  • News + Events
  • Idea + Phenomena
  • Projects

THE NEW RESIDENCE AT THE SWISS EMBASSY

2006

Description +

PROGRAM: residence including living spaces for ambassador, staff quarters and representational spaces

CLIENT: Swiss Federal Office for Buildings and Logistics (BBL)

SIZE: 23,000 sq ft

STATUS: Complete

This scheme placed first in the competition of ten Swiss-American team’s designs for the replacement of the Washington D.C. residence of the Swiss Ambassador. It is not only to be a private house but also a cultural gathering place on which standards and self-image of a country are measured.

Sited on a hill with a direct view through the trees to the Washington monument in the distance, a diagonal line of overlapping spaces drawn through a cruciform courtyard plan was the conceptual starting point. Official arrival spaces and ceremony spaces are connected along this diagonal line on the first level, while private living quarter functions are on the floor above.

Materials are charcoal integral color concrete trimmed in local slate and sand-blasted structural glass planks. Constructed according to Swiss ‘Minergie Standard’, the south facades use passive solar energy. The roof is a ‘sedum’ green roof with PVC panels.

The existing natural landscape will be clarified with new walkways and trees, while the plateau of the residence defines an arrival square: a reception courtyard and an herb garden with sub-floor wiring flexibilities.

FOR RESIDENTIAL INQUIRIES
Molly Blieden, Managing Associate
t + 1 212 629-7262 x14
molly@stevenholl.com

Ecological Innovation +

– Meets the Minergie Standard, a Swiss Sustainable Building Standard equivalent to USGBC Platinum certification
– Circulating pool
– Translucent glass ventilated hollow walls

Credits +

  • landscape architect

    - Robert Gissinger

  • architect

    - Steven Holl Architects

    Steven Holl (design architect)

    Tim Bade, Stephen O'Dell (associate in charge)

    Olaf Schmidt (project architect)

    Arnault Biou, Peter Englaender, Annette Goderbauer, Li Hu, Irene Vogt (project team)

    - Rüssli Architekten AG

    Mimi Kueh (project architect)

    Justin Rüssli (design architect)

    Andreas Gervasi, Phillip Röösli, Rafael Schnyder, Urs Zuercher (project team)

  • structural engineer

    - A. F. & J. Steffen Consulting Engineers

    - Robert Silman Associates

  • mechanical engineer

    - B2E Consulting Engineers

    - B+B Energietechnik AG

  • interior designer

    - ZedNetwork Hannes Wettstein

  • general contractor

    - James G. Davis Construction

    - Niersberger Gebäudetechnik Pforzheim GmbH

News +


  • 2006 11/01 The Swiss Point of View
  • 2006 11/01 Steven Holl: Swiss Residence
  • 2006 09/14 An Ambassador’s Stone-Cold Party Pad
  • 2006 12/01 Cutting Corners
  • 2004 02/04 Switzerland’s Residence to Yodel About
  • 2007 06/06 A Translucent and Radiant Partner with the Past
  • 2016 01/06 Swiss Ambassador recounts meeting Steven Holl in his 2015 Highlights

Awards +


  • 2007 Washington Building Congress Craftsmanship Award: Curtainwall
  • 2007 AIA NY Architecture Honor Award
  • 2007 RIBA International Award
More relevant works
© 2023 Steven Holl Architects Search

450 West 31st Street, New York, NY 10001 (212) 629-7262