Helsinki, Finland 2024
PROGRAM: 115 apartments, exterior spaces to all units, saunas, yoga studio, wine cellar, common leisure and coworking spaces, 12-seat cinema, garage including 1 car for shared use
CLIENT: City of Helsinki, Newil&Bau
SIZE: 95,650 sf / 8886 sm
STATUS: construction
Meander shapes void spaces within an urban block and maximizes views and sunlight for 115 apartments. The 180-meter-long building, varying in height from two to seven floors, traverses its rectangular site like a musical score. Located in Helsinki’s cultural district Taka-Töölö along Taivallahti Bay, the site is bordered by the Taivallahti Barracks of apartments and offices. Rising in section towards the sea horizon, Meander introduces openness to the historic barracks.
The facade concept evokes a wooden ship inside a glass bottle. Meander is carried by load bearing perpendicular concrete walls and glazed with horizontally hinged glass panels. The atmosphere of each apartment is characterized by the unique, varying quality of Nordic light. All units open onto the landscape through high windows and private balconies with views to the Baltic Sea horizon or Hesperianpuisto Park. At night, the building glows like an ice sculpture.
The building is imbued with the experiential dimension of material and detail. Custom door handles, light fixtures, hand woven wool carpets, and cast dog bowls echo the Meander form. All wood is locally sourced, including sustainably harvested Finnish spruce for the exterior cladding, balconies, and windows.
Sixteen geothermal wells heat and cool the building, with radiant floors throughout the units, minimizing overall lifecycle emissions. All units receive natural light and ventilation. An extensive green roof and solar array provide performance benefits and a sloping scenic footpath. Gardens shaped by the building voids incorporate rainwater collecting systems and diverse plantings, including native wild species.
Among the shared spaces for residents are saunas, yoga studio, wine cellar, common leisure and coworking spaces, and a 12-seat cinema. Art and architecture are synthesized through the work of Finnish visual artist Fanny Tavastila, who created unique pieces for each resident’s home as well as the common living spaces of Meander.
Steven Holl Architects achieved international acclaim with the competition-winning design for the Kiasma Museum of Contemporary Art, completed in 1997. Meander marks the studio’s return to Helsinki upon winning the competition for an apartment building in 2006, collaborating first with local Finnish architect Vesa Honkonen and then with Pentti Kareoja from ARK-house Architects. In 2021, Newil&Bau acquired the development, enhancing the design by adding meticulously crafted yard spaces, curated interiors, and innovative, resident-centric services. Steven Holl Architects x Newil&Bau Meander completed in 2024.
– geothermal heating and cooling (16 wells 340m deep)
– extensive green roof
– roof mounted solar panels
– stormwater management feature
– local materials, including sustainably harvested Finnish spruce wood on exterior cladding, balconies and windows
– natural light and air via balconies to every unit
architect
- Steven Holl Architects
Steven Holl (design architect)
Noah Yaffe (partner in charge)
JongSeo Lee (project architect, senior associate)
Alfonso Simelio, Okki Berendschot, Hannah Ahlblad, Sungjoon Chae, Yiqing Zhao, Nour Chahboun (project team)
local architect
- ARK-house Architects
Pentti Kareoja (principal architect)
Pauli Terho (project architect)
Tigran Khachatryan, Jari Lepistö, Jukka Salonen, Lotta Skogström, Emma Torkkel (project team)
- Vesa Honkonen Architects
Vesa Honkonen (principal architect, competition)
Anja Hämäläinen, Mari Koskinen, Tina Olli, Jaana Tiikkaja, Erika de Martino (project team, competition)
master planning
- Helsinki City Planning Office
Janne Prokkola
interior design
- Fyra
Tiina Närkki, Emma Keränen, Merja Virkkunen, Sisko Anttalainen, Otto Kaipio
landscape
- VSU Maisema-arkkitehdit Oy
Outi Palosaari, Minna Raassina
structural engineer
- A-insinöörit Suunnittelu Oy
Sami Moisio (principal engineer)
Jukka Paappanen, Jani Hyyryläinen, Mikko Hanka, Ali Mohseni, Sallamari Hietanen, Joonas Kärki (project team)
HVAC engineer
- Sitowise
Jaakko Juslin, Pekka Kytömäki
electrical
- Sitowise
Mikko Auvinen, Petja Berg
fire
- Sitowise
Sami Hämäläinen, Jere Sulkama, Satu Stenfors
contractor
- SSA
Samuli Särkiniemi, Keijo Laasonen, Olli Pyhäjoki, Mikko Ohra-Aho, Anton Väänänen, Jari Kolehmainen, Antti Kuusisto, Eila Malanin, Akseli Escartin, Katariina Suominen, Pekka Alajoki, Eemeli Henttonen, Ville Puurtinen, Niko Aaltonen
glazing designer / contractor
- Stamper Solutions
Aleksei Sapunov, Konstantin Obersneider, Signe Siemann