OSTRAVA CONCERT HALL

Ostrava, Czech Republic. 2019

Description +

PROGRAM: Chamber Hall, event and gathering spaces, Theater Hall, Music and Rehearsal Halls, Grand Foyer, restaurant, cafe, shop, lobbies

CLIENT: City of Ostrava for the Janacek Philharmonic Orchestra

STATUS: In Design

First Place in Competition, 2019

The city of Ostrava in the Czech Republic will build a new 1,300 seat concert hall sited adjacent to the existing 20th century Cultural Center. The concept of a “perfect acoustic instrument in its case” is proposed for Ostrava’s Janacek Philharmonic Orchestra, the leading Czech orchestra for commissioning Contemporary Music.

The Concert Hall faces the existing Park to the North, thus minimizing noise from the main boulevard to the South. A new entrance hovers over the Esplanade and transports the public above the historic House of Culture into a sky-lit lobby for the Concert Hall. The dramatic complimentary contrast of old and new creates a Cultural Landmark for Ostrava. The new architecture points to the future of the city of Ostrava.

The smooth iconic steel case holds an “instrument”, the 1300-seat Concert Hall, in an extended vineyard type plan made of concrete and maple wood. Czech composer, Leos Janacek’s theories of time will guide and give order to the concert hall’s interior geometry. Acoustic wall panels are organized according to Scasovani, or rhythm in three variants.

1. Znici = sounding

2. Scitaci = counting

3. Scelovac = summing

The proposed building uses a simple material palette: clear glass for the entranceway and lightweight zinc cladding for the building volume in complimentary contrast to the ceramic tile and travertine base of the House of Culture. Pre-patina, blue-grey zinc is proposed for its environmental friendliness as a 100% recyclable material and its flexibility in cladding the curved geometry. The interior is made of maple wood like a great violin and provides ideal acoustics. Sound-absorbing scratch coat plaster and raw crinkled concrete complement the experience at the gathering spaces.

The glass walls and skylights infuse the building with natural light and lessen reliance on nonrenewable energy. Visitors are embraced within a light-filled environment that changes organically during the day and seasons. Skylights increase ambiance during the day and illuminate at night when the building glows from within and casts light to the Esplanade and the park.

Ecological Innovation +

– Pre-patina, blue-grey zinc 100% recyclable cladding is proposed for its environmental friendliness as a 100% recyclable material
– Sound-absorbing scratch coat plaster and raw crinkled concrete complement the experience at the gathering spaces

Credits +

  • architect

    - Steven Holl Architects

    Steven Holl (principal)

    Dimitra Tsachrelia, Lirong Tan (project architect)

    Olaf Schmidt (associate in charge)

    Filipe Taboada, Sarah Schlegelmilch, Paul Hazelet, Maxwell Funk, Apostolos Gredis (design team)

  • associate architects

    - Architecture Acts

    Hana Petrikova, Martin Kropac (principal)

    Klara Zugarova, Miarianna Antoniadoi, Hana Hucikova, Tiziana Tasca, David Lasek (design team)

  • acoustical consultant

    - Nagata Acoustics

  • structural engineer

    - Silman

  • sustainability

    - TRANSSOLAR Energietecknik GmbH

  • theatre consultant

    - Theatre Consultants Collabrative

  • Jan Fiala

    - traffic

  • Petr Havlicek

    - fire protection

Quotes +


  • Rafi Segal, Jury Member “It’s not the size of the building, but the importance and significance of it.”
  • Krzysztof Ingarden, Jury Member “It is a fantastic piece of architecture considering very well the relationship between the City of Ostrava and the park behind the existing building. I believe the winning project will be an emblematic piece of architecture for Ostrava revitalizing the city as well.”

News +


  • 2022 02/23 Ostrava Concert Hall is scheduled to break ground in September 2022
  • 2021 02/10 Snow Happening: Outlining the Ostrava Concert Hall
  • 2020 01/10 Ostrava Concert Hall Given the “Go Ahead” by Ostrava Mayor Tomas Macura
More relevant works
© 2023 Steven Holl Architects Search

450 West 31st Street, New York, NY 10001 (212) 629-7262